← blog 02 apr 26

the first batch is out

placeholder post. thirty slabs went out this month, which is the largest run we’ve done and the first time the shop has felt like a production line rather than a bench.

the only casualty was an M2 tap that sheared in the twenty-eighth case. the case survived, the tap did not, and there is now a spare in the drawer.

write the real post here.